- Details
The building was delivered in kit form to a very wet field (if you think IKEA flatpacks are hard work take a look at this lot!). The lane had to be cut back, the gate removed and the bank had to be levelled off a bit to get the articulated truck in.
- Details
The floor joists are all in place and shuttering was being installed around the storage area in preparation for a concrete pour later in the day.